CN Fountain Slide

About the Project: Build Fast Track Mitigation Project (June 2016 – November 2016)

Our Task: Installaltion of:

  • 250 micropiles. Diameter = 346mm, lengths range = 24.4m – 30.5m
  • 30 strand anchors. 18 strands per anchor. Length = 36m each
  • Concrete waler at base of existing beam and lagging retaining wall

Techniques used: Micro Piles