SaskPower QESS & QE18 Aspen Ridge Foundations
About the Project: Soletanche Bachy Canada was contracted by SaskPower Corporation (December 2017 – January 2018) to construct large diameter bored concrete foundations for electrical transmission poles at two project sites in Saskatoon, Saskatchewan.
Our Task: Construction of 18 bored concrete piles
Techniques used: Bored Concrete Piles