Winnipeg Art Gallery Inuit Art Exhibition
About the Project: General contractor PCL contracted Soletanche Bachy Canada (June 2018 – August 2018) to complete the temporary shoring and foundation work for the Winnipeg Art Gallery’s Inuit Art Gallery expansion project.
Our Task: Design and Build of Shoring, Installation of Precast Driven Piles, Installation of 36 steel soldier piles for 340sq meters of the temporary shoring.
Techniques used: Shoring and Precast Driven Piles, Design and Build